7 billion contract in 2009 to build the first 18 km of the | |
---|---|
from the original on 16 June 2011 | A consortium of CRCC and CMC with the constructed the |
from the original on 2015-07-28.
9PDF from the original on 2018-10-22 | from the original on July 3, 2015 |
---|---|
6 km of the rail line from Dakar to the Malian border | from the original on September 26, 2015 |
5 billion was launched in November 2015 as a joint venture between the China Railway Construction Corporation Limited and Pakistan's Zahir Khan and Brothers, Engineers and Constructors.